Implementation

Post-construction Stormwater Management

 



Purpose

This measure focuses on mitigating stormwater impacts from new and re-development by requiring practices that treat, store, and infiltrate stormwater onsite. Towns should use the minimum disturbance size they normally regulate (whether it's 0.5 acres per the Erosion Sediment Control Act or smaller if your town uses a lower threshold) for the stormwater retention standards in this section.

Relevant terms

Redevelopment: means any construction activity (including, but not limited to, clearing and grubbing, grading, excavation, and dewatering) within existing drainage infrastructure or at an existing site to modify or expand or add onto existing buildings or structures, grounds, or infrastructure.

Low impact development (LID): means a site design strategy that maintains, mimics, or replicates pre-development hydrology through the use of numerous site design principles and small-scale treatment practices distributed throughout a site to manage runoff volume and water quality at the source.

Runoff reduction practices: means those post-construction stormwater management practices used to reduce post-development runoff volume delivered to the receiving water, as defined by retaining the volume of runoff from a storm up to the first half inch or one inch of rainfall in accordance with sections 6(a)(5)(B)(i) or (ii) respectively. Runoff reduction is quantified as the total annual post-development runoff volume reduced through canopy interception, soil amendments, evaporation, rainfall harvesting, engineered infiltration, extended filtration or evapotranspiration.

Water Quality Volume (WQV): means the volume of runoff generated by one inch of rainfall on a site as defined by the Connecticut Stormwater Quality Manual.

Resources

Low Impact Development

Developing a Sustainable Community - guide developed by NEMO to help Connecticut communities craft plans and regulations that protect water quality.

The Center for Watershed Protection developed a Code and Ordinance Worksheet (COW) to help communities evaluate their local development regulations to identify revisions that allow (or require) site developers to minimize impervious cover, conserve natural areas and use runoff reduction practices to manage stormwater runoff.

CT NEMO sample LID checklist for site plans.

Powerpoint presentation on Low Impact Development and Directly Connected Impervious Area requirements in CT's MS4 permit.


Directly Connected Impervious Area

This video reviews all things DCIA in the MS4 permit:


Long term maintence of stormwater ponds and structures

The stormwater wet pond and wetland management guidebook offers detailed guidance on how to properly maintain stormwater ponds.

Task list

Where the deadline for new MS4 permittees differs from the deadline for exisiting permittees, the second deadline in parenthesis applies to new permittees.

Activity

Deadline

Permit page

Maintenance plan for stormwater ponds and treatment structures

Jul 1 2019
(Jul 1 2020)

30

Determine baseline DCIA

Jul 1 2020

30

Review regulations for LID barriers

Jul 1 2021
(Jul 1 2022)

27

Establish legal authority for site stormwater retention standards

Jul 1 2021
(Jul 1 2022)

27