Tools

CT Guidelines on Soil Erosion and Sedimentation Control

The MS4 Permit requires towns to pass legal authority to require that contractors, developers, and construction site operators maintain consistency with the CT Guidelines for Erosion and Sedimentation Control. The Guidelines were published by DEEP in 2002 and amended in 2011 to provide for Low Impact Development practices.

The Guidelines and LID Amendment can be viewed and downloaded below.

SESC Guidelines

Download [13.7 MB]

LID Amendment

Download [0.56 MB]