Ellington

Project Team

Date: Fall 2024
UConn Students: John Bechtle, Emily Markelon
UConn CLEAR: David Dickson, Michael Dietz


The Runoff Reduction Report

This report includes recommendations for green stormwater infrastructure practices at 4 sites in the town of Ellington. Each site is displayed with an ArcGIS map of the recommended practice, detailed description of our recommendations, and an informational table. Each table shows an estimated drainage area, our recommended green infrastructure, annual gallons of runoff treated, nitrogen and phosphorus pollution reduction amounts, and the suggested size of each practice. These estimations were calculated based on the drainage area, annual rainfall estimates specific to Connecticut, and literature export values.


GSI Summary Table

The following calculations display the potential pollutant-reducing benefits if the practices identified within the report were implemented:

Site Location GSI Suggestion Drainage Area Annual Gallons Treated Annual Nitrogen Reduction (lb N/yr) Annual Phosphorous Reduction (lb P/yr) Suggested Practice Size [6in depth] (sq ft)
1 Ellington Middle School Rain Garden 1 14,509 382,064 3.17 0.40 1886 (10in)
Rain Garden 2 5,422 142,777 1.19 0.15 705 (10in)
Rain Garden 3 4,658 122,654 1.02 0.13 606 (10in)
Rain Garden 4 1,000 26,333 0.22 0.03 130 (10in)
Rain Garden 5 500 13,167 0.11 0.01 108
2 Center Elementary School Rain Garden 1 6,578 173,210 1.44 0.18 1,425
Rain Garden 2 3,920 103,226 0.86 0.11 849
Rain Garden 3 2,483 65,383 0.54 0.07 538
Rain Garden 4 1,742 45,883 0.38 0.05 378
3 Ellington Town Hall Annex Rain Garden 1 3,950 104,016 0.86 0.11 514 (10in)
4 Ellington High School Rain Garden 1 3,049 80,295 0.67 0.08 661
Rain Garden 2 3,572 94,060 0.78 0.20 774

Totals

Total IC Disconnected (sq. ft.) Annual Gallons Treated Annual Nitrogen Reduction (lb. N/yr) Annual Phosphorous Reduction (lb. P/yr)
Total 47,811 1,259,008 10.46 1.32