Project Construction: Two rain gardens are to be implemented in the northern grassed area of the middle school to collect stormwater runoff from the roof.


The Runoff Reduction Report

This report includes recommendations for green stormwater infrastructure practices at 11 sites in the town of Milford. Each site is displayed with an ArcGIS map of the recommended practice, detailed description of our recommendations, and an informational table. Each table shows an estimated drainage area, our recommended green infrastructure, annual gallons of runoff treated, nitrogen and phosphorus pollution reduction amounts, and the suggested size of each practice. These estimations were calculated based on the drainage area, annual rainfall estimates specific to Connecticut, and literature export values.


Photo Gallery

Milford Project Location

Site Design

Plans

Rain Garden at East Shore Middle School

Project designs were created by the Rutgers University Water Resources Program.


GSI Summary Table

The following calculations display the potential pollutant-reducing benefits if the practices identified within the report were implemented:

 

Site Location GSI Suggestion Drainage Area (sq. ft.) Annual Gallons Treated Annual Nitrogen Reduction (lb. N/yr) Annual Phosphorous Reduction (lb. P/yr) Suggested Practice Size [6 in. depth] (sq. ft.)
1 Orange Avenue School Planters 5,100 129,703 0.882 0.063 4 Planters
Rain Garden 2,270 57,731 0.393 0.028 380
2 Jonathan Law High School Rain Garden 1 446 11,344 0.077 0.005 74
Rain Garden 2 1,931 49,116 0.334 0.024 322
3 Meadowside Elementary School Rain Garden 1 1,401 35,630 0.242 0.017 233
Twin Rain Gardens 1,303 33,138 0.225 0.016 218
Cistern 1,022 25,992 0.177 0.013 55
Rain Garden 2 1,049 26,678 0.181 0.013 174
4 Calf Pen Meadow School Rain Garden 11,330 288,145 1.90 0.139 1,890
5 East Shore Middle School Rain Garden 1 1,330 33,830 0.230 0.016 220
Rain Garden 2 1,290 32,800 0.223 0.016 215
Rain Garden 3 1,850 47,050 0.320 0.023 310
6 Live Oaks Elementary School Rain Garden 1 7,378 187,637 1.276 0.091 1,230
Rain Garden 2 4,665 118,386 0.805 0.057 583
Planter 331 8,418 0.057 0.004 1 Planter
7 Mathewson Elementary School Bioretention Area 3,707 94,289 0.641 0.045 618
8 Orchard Elementary School Rain Garden 1 1,171 29,768 0.203 0.014 195
Rain Garden 2 2,326 59,155 0.402 0.029 387
9 Pumpkin Delight Permeable Pavement 7,942 201,981 1.374 0.097 7,942
10 Harborside Middle School Rain Garden 1 3,623 92,145 0.627 0.044 604
Rain Garden 2 3,549 90,251 0.614 0.044 592
Rain Garden 3 5,006 127,318 0.866 0.061 834
Planters 757 19,252 0.131 0.009 126
11 Joseph A. Foran High School Rain Garden 1 5,948 151,270 1.030 0.073 991
Rain Garden 2 19,377 492,791 3.35 0.238 1,614

Totals

Total IC Disconnected (sq. ft.) Annual Gallons Treated Annual Nitrogen Reduction (lb. N/yr) Annual Phosphorous Reduction (lb. P/yr)
Total 96,608 2,456,935 16.4 1.175