Construction Site Stormwater Runoff Control

Purpose

Construction sites can be substantial sources of pollution to our waterways if stormwater management controls aren't in place. This section of the permit outlines minimum standards for preventing stormwater runoff from construction activities that disturb one or more acres of land.


 

Relevant Terms

Development: means any construction or grading activities to improved or unimproved real estate.

Disturbed area: means an area where the ground cover is destroyed or removed leaving the land subject to accelerated erosion.

Resources

Statewide Construction Site Guidance

Under this control measure, towns should require developers, construction site operators and contractors to be consistent with the practices and standards in Connecticut's Updated Guidelines for Soil Erosion and Sedimentation Control and Updated Stormwater Quality Manual.

Legal Authority

Construction site stormwater runoff control legal authority guidance.

Example Stormwater maintenance declaration from the Greenwich Stromwater Drainage Manual.

CT DEEP Construction General Permit

Communities are required to notify developers that they may have to meet additional stormwater requirements under the CT DEEP Construction General Permit. The construction general permit applies to projects disturbing more than 5 acres. For more information, visit our Construction Stormwater General Permit page.

Site Inspection Checklists for Stormwater

Interconnected MS4 Letter

Letter template for establishing interagency agreements to control pollutants between interconnected MS4s.


Task list

Most requirements for this section are in effect as of July 1, 2017 for all MS4s but more time is provided for the legal authority component.

Activity Deadline Permit Page
Implement interdepartmental coordination plan Jul 1 2017 26
Conduct plan reviews for stormwater control practices Jul 1 2017 26
Conduct site inspections for stormwater control practices Jul 1 2017 26
Receive public input on development projects Jul 1 2017 26
Notify developers of DEEP Construction general permit Jul 1 2017 26
Update (or establish) construction site legal authority Jul 1 2019 25